The simplest way to build an overflow drainage channel for swimming pools, without having to construct it manually on site. A concrete block construction system that allows for precise leveling and integrates the pool coping edge and the ceramic pool grate
Pool drainage channel

Advantages of using the concrete block construction system
Fast and precise installation
Resistance in pool environments
Stable base for ceramic pieces
Sistema modular adaptable
Avoids building the channel manually on site
Do you have any questions about this product?
Our technical team is available to answer any questions you may have. In addition, we have prepared a technical document you can consult for more information.
Overflow channel, properly executed from the start
The execution of a pool perimeter overflow channel usually requires formwork, manual adjustments, and a high level of precision to achieve the correct slope and proper integration with the grate.
With our Block 25 construction system, on-site installation becomes much easier.
Pool corner pieces
Pieces for stair access
How is the prefabricated channel installed?
In this video, you can see how the pool perimeter channel is executed using the Block 25 System
Watch the installation step by step
Compatible with the Mayor ceramic system
The Block 25 System is designed to integrate with:
This allows the overflow channel to be resolved as a complete pool system
Real projects
Pools built with the Block 25 system
Are you designing or building an overflow pool?
Our technical team can help you define:














